124 City Road, London EC1V 2NX Mon-Fri 8:00-16:00 · Sat 9:00-13:00
office@refurbsquad.co.uk 07514 609175
Refurb Squad Ltd
07514 609175Request Estimate
London hip roof re-tile in progress showing new red clay tiles, mortar bedding and roofing membrane by Refurb Squad

Roofing Installation · London

Roofing installation
in London,
watertight for the long haul.

Pitched roof re-cover, flat roof replacement in felt / EPDM / GRP, gutter and fascia works, and leadwork, installed by a founder-led team on a fixed price agreed before we start.

Request a free estimate 07514 609175

5.0★ on Google · £1M insured · Written quote back in the same week.

15 yrs

On the tools

£1M

Public liability

5.0★

Google rated

12 mo

Workmanship guarantee

Same wk

Written quote

Service overview

Roofing installed to actually last, not just to sell you

What it is

Pitched roof re-covers in slate and tile, flat roof replacements in felt / EPDM / GRP, extension and dormer roofing, chimney flashing and leadwork, gutter and fascia replacement, and roof-space insulation upgrades.

Who it's for

Homeowners with an aging roof, buyers whose survey has flagged the roof, landlords needing a warrantied re-cover before letting, and clients on renovation and extension projects.

When you need it

Slipped or missing tiles, sagging ridges, damp patches on upstairs ceilings, failed felt on garages and dormers, blocked or ice-damaged gutters, or a survey report flagging the roof at property purchase.

Why professional matters

Roofing failures don't stay on the roof, water finds joists, plasterboard, insulation and electrics. A properly detailed roof lasts 40+ years; a badly detailed one leaks inside 5.

The cost of getting it wrong

What poor roofing quietly destroys

The roof is the most weather-exposed part of the building. Corners cut here become interior repairs five to ten years later.

If ignored

  • Water damage tracks inward

    A single slipped tile or failed flashing can drip onto ceilings, insulation, electrics and eventually joists, a small repair becomes a full loft rebuild.

  • Failed flat roofs = wet ceilings

    Cheap felt on dormers and garages fails inside 5 years. EPDM or GRP done properly lasts 25+.

  • Poor leadwork = chimney leaks

    Mortar flashings instead of proper lead soakers and cover flashings around chimneys are the #1 cause of chimney-breast damp.

  • Missing ventilation = condensation

    Modern roof insulation without proper eaves ventilation causes condensation on the underside of the roof, mould, dry rot, wet insulation.

Common mistakes

  • Torch-on felt on domestic dormers

    Torch-on is a specialist product often mis-applied on domestic jobs. EPDM or GRP is safer, longer-lasting and warrantied.

  • Mortar-only flashings

    Sand-and-cement flashings around chimneys and pitch changes are cheap and fail fast. Proper lead work costs more once, lasts decades.

  • Skipping the ventilation upgrade

    Adding insulation without upgrading eaves and ridge ventilation traps moisture. The insulation quickly becomes worthless.

How it works

A step-by-step system,
not a guess.

  1. 01

    Step 1

    Free survey

    Full roof inspection, condition of covering, battens, felt, flashings, gutters and ventilation.

  2. 02

    Step 2

    Fixed written quote

    Itemised written quote back inside the same week, scope, materials, scaffolding and timeline.

  3. 03

    Step 3

    Scaffold & strip

    Scaffolding erected, old covering stripped, and any damaged battens or timber replaced.

  4. 04

    Step 4

    New covering & detailing

    New underlay, battens, tiles or membrane installed to manufacturer spec, with lead flashings and correct ventilation.

  5. 05

    Step 5

    Sign-off & 12-month guarantee

    Final inspection, scaffold down, waste removed, 12-month workmanship guarantee in writing (manufacturer warranties on top).

What you actually get

Concrete outcomes,
not adjectives.

One fixed price

Scaffolding, strip, materials and install on a single quote.

Proper leadwork

Lead soakers and cover flashings on every pitch change and chimney, not mortar shortcuts.

Ventilation done right

Eaves and ridge ventilation upgraded whenever insulation is upgraded.

Warrantied materials

EPDM / GRP flat roofs installed by manufacturer-trained installers with system warranties.

One accountable team

Roofing coordinated with any structural, insulation or dormer work under one contract.

12-month guarantee

Written workmanship guarantee on top of manufacturer material warranties.

Materials & methods

Coverings, materials & methods we install

The right roof covering depends on the property's period, pitch and any conservation-area constraints. Here's the range we work in.

Materials we work with

  • Natural slate (Welsh, Spanish, Brazilian) on period properties
  • Interlocking concrete and clay tiles on modern pitched roofs
  • Plain clay tiles on Victorian and Edwardian terraces
  • EPDM rubber membrane for warrantied flat roofs (25-year system warranty)
  • GRP fibreglass roofing for garages and dormers
  • Code 4 and Code 5 lead sheet for flashings and soakers
  • Aluminium and PVC gutters, fascias and soffits
  • Breathable roofing underlay to BS 5534

Methods & standards

  • Battens gauged to BS 5534 for the specific tile / slate pitch
  • Lead soakers under every course intersecting a wall or chimney
  • Ridge ventilation and eaves ventilation upgraded on every re-cover
  • EPDM and GRP installed by manufacturer-trained installers with system warranty
  • Scaffolding to relevant PASMA / TG20 standards for the roof profile

Variations of this service

Full pitched roof re-cover

Strip existing tiles / slates, replace underlay, batten to BS 5534, re-tile / re-slate. Typically 5-10 days on site.

Flat roof replacement

EPDM or GRP flat roof replacement on garages, dormers or rear extensions. Warrantied system.

Dormer roof & window

New dormer roofs as part of a loft conversion, or replacement of failing existing dormers.

Chimney flashings & repointing

Lead cover flashings, soakers and repointing to stop chimney-breast damp.

Gutter & fascia renewal

Aluminium or PVC gutters, fascias and soffits replaced with correct falls and downpipe runs.

Property types & settings

We work on Victorian and Edwardian terraces (with heritage-appropriate slate and clay), 1930s semis, mansion-block dormer works (with landlord consent) and modern new-builds.

Answers

Straight answers,
before you call.

Still not sure? Call Jay directly on 07514 609175.

Every roof is quoted after a survey. A re-cover on a 3-bed terrace is a different job to a full replacement on a 5-bed semi with dormers, you'll have an itemised written quote back inside the same week.

A typical pitched re-cover on a 3-4 bed London property runs 5-10 days including scaffold up and down. Flat roofs (dormers, garages) are usually 2-4 days.

Yes, EPDM rubber and GRP fibreglass, both installed by manufacturer-trained installers with system warranties.

Yes. Code 4 and Code 5 lead soakers, cover flashings and step flashings, not mortar shortcuts.

We deliver conservation-area work with matching slate and traditional detailing, but do not market listed-building work as a headline specialism.

£1,000,000 public and employer's liability insurance, plus scaffolding installed under the appropriate PASMA / TG20 standards.

12-month workmanship guarantee in writing, sitting on top of manufacturer material warranties (25-year EPDM system warranty as standard).

Yes, aluminium or PVC gutters, fascias and soffits with correct falls and downpipe runs.

North and West London, St John's Wood, Paddington, Kensington, Bayswater, Regents Park, Hampstead, Hammersmith, Chiswick and Ealing.

London roofing preparation with battens and breathable membrane used as a refurbishment call-to-action background

Book your free survey

Ready to price your roofing installation
the honest way?

One site visit. One fixed-price written quote back the same week. No pressure, no hard sell, just the number and the plan to deliver it.

  • Free local survey
  • Written quote the same week
  • Fixed-price, staged payments
  • 12-month workmanship guarantee

Related services

Other work we deliver

View all services

Service

House Extensions

Learn more

Service

Loft Conversions

Learn more

Service

Full Renovations

Learn more
Call JayRequest Estimate