124 City Road, London EC1V 2NX Mon-Fri 8:00-16:00 · Sat 9:00-13:00
office@refurbsquad.co.uk 07514 609175
Refurb Squad Ltd
07514 609175Request Estimate
Loft conversion mid-build in a London property showing new stud framing, joists and a Velux roof window fitted by Refurb Squad

Loft Conversions · London

Loft conversions
in London,
delivered watertight and signed off.

Dormers, mansards and hip-to-gable conversions built to spec, structural steels, insulation, fire-rated staircases, dormer glazing and second-fix all inside one fixed-price contract. Typical dormer conversion: 8-12 weeks on site.

Request a free estimate 07514 609175

5.0★ on Google · Constructionline Gold · Written quote back in the same week.

15 yrs

On the tools

£1M

Public liability

5.0★

Google rated

12 mo

Workmanship guarantee

Same wk

Written quote

Service overview

Loft conversions engineered for London terraces

What it is

A full loft conversion covers structural design, planning or permitted-development submission, Party Wall Notices, structural steels, dormer or mansard build, roof insulation, fire-rated protected staircase, first fix, second fix, and internal finishing including a new ensuite where required.

Who it's for

Owners of London terraces, semis and townhouses looking to add a master bedroom with ensuite, a second family bathroom, a home office or a teenager's suite without the disruption of moving.

When you need it

Most owners convert when a growing family has outgrown the existing bedroom count, when a home office is now permanent, or when they're extending downstairs and want to add the loft in the same programme to avoid two waves of disruption.

Why professional matters

A loft is a structural project sitting on top of your family home. Getting the steels, the fire strategy and the roof detailing right is what makes the difference between a warm, quiet, dry additional floor and a room that leaks, freezes and fails building control.

The cost of getting it wrong

What goes wrong when a loft is done cheaply

The most common failure modes on loft conversions are structural, fire-safety and thermal. All three are invisible until they aren't.

If ignored

  • Steels that deflect

    Undersized steels deflect under load, cracking new plasterboard ceilings on the floor below within the first winter.

  • Fire strategy failures

    The staircase up to a loft becomes a protected escape route. Get the fire-doors, plasterboard specification or self-closers wrong and building control won't sign off, full stop.

  • Cold roofs, warm bills

    Insulation stuffed between rafters without a ventilated void condenses in winter. You get sagging plasterboard, black mould at ridge lines, and heating bills you can't explain.

  • Bad dormer detailing = leaks

    The join between an old slate roof and a new flat-roof dormer is the #1 failure point of cheap conversions. It leaks quietly for months before you see the stain on the ceiling below.

Common mistakes

  • Skipping the Party Wall step

    Loft steels almost always bear into party walls. Skip the notices and a neighbour can stop the job at inspection.

  • Choosing lowest-price glazing

    Roof-window and dormer glazing spec matters, u-values, solar-gain and acoustic ratings all drive comfort in a top-floor room.

  • Cutting the staircase short

    Head-height at the top of a new loft stair is regulated. Get it wrong and you're rebuilding the stair after building control refuses to sign off.

How it works

A step-by-step system,
not a guess.

  1. 01

    Step 1

    Feasibility survey

    We measure head-heights, check the roof structure and confirm what's achievable, dormer, mansard, hip-to-gable or a straight rooflight conversion. Free locally.

  2. 02

    Step 2

    Design & fixed quote

    Structural engineer sign-off, architectural drawings, and a fixed itemised quote back inside 2-3 weeks.

  3. 03

    Step 3

    Planning & Party Wall

    Permitted development or planning submission, Party Wall Notices served, building control appointed.

  4. 04

    Step 4

    Structural build

    Steels installed, dormer/mansard framed, roof made watertight, insulation and vapour control installed to spec.

  5. 05

    Step 5

    Sign-off & guarantee

    Building control completion certificate, fire strategy signed off, snag-free handover, 12-month workmanship guarantee.

What you actually get

Concrete outcomes,
not adjectives.

Fixed-price contract

No day-rate creep. The quote is the invoice.

Correctly sized steels

Steels engineered against actual loads, not guessed at. No sagging ceilings on the floor below.

Fire strategy done right

Protected staircase, FD30 fire doors and plasterboard spec detailed against building regs Part B.

Warm roof detailing

Ventilated or fully-warm roof strategy, correctly detailed to eliminate condensation.

Building control handled

Planning, Party Wall, building regs and completion, arranged as part of the job.

12-month guarantee

Written workmanship guarantee, plus manufacturer warranties on glazing and roofing.

Materials & methods

Loft conversion types & construction methods

The right loft type depends on your existing roof pitch, ridge height, and whether you're in a conservation area. Here's the range we build.

Materials we work with

  • Structural steel schedules designed by an independent engineer
  • Timber and engineered-joist floor structures over new steels
  • Warm-roof insulation systems (PIR / mineral wool) with vapour control layers
  • Slate, tile and single-ply membrane dormer roof finishes
  • Aluminium, timber and uPVC dormer glazing to spec
  • Velux and Fakro conservation-grade rooflights
  • FD30 fire doors, self-closers and mains-linked smoke detection

Methods & standards

  • Steel design and sign-off by an independent structural engineer
  • Party Wall Awards where steels bear into shared walls
  • Fire strategy detailed to Approved Document B
  • Warm-roof or fully-ventilated-cold-roof insulation strategy chosen against roof form
  • Building control inspections at structure, insulation and completion

Variations of this service

Rear dormer conversion

The most common London loft type, a flat-roof dormer to the rear of a Victorian or Edwardian terrace. Adds full head-height across the loft footprint.

L-shape / wrap-around dormer

Standard rear dormer combined with an infill over the back-addition roof. Maximises floor area on tight terraces.

Mansard conversion

Reshapes the roof with a near-vertical front and rear slope. Highest volume; usually requires planning permission.

Hip-to-gable conversion

Converts a hipped side roof into a vertical gable, adding significant volume on semis and end-of-terrace houses.

Velux / rooflight conversion

Minimal external change, rooflights only. Suited to properties with existing generous head-height and conservation-area restrictions.

Property types & settings

We convert lofts in Victorian and Edwardian terraces, mansion-block top floors (subject to freeholder consent), 1930s semis and Georgian townhouses across North and West London.

Answers

Straight answers,
before you call.

Still not sure? Call Jay directly on 07514 609175.

Every loft is quoted on a fixed-price basis after a feasibility survey. Roof form, dormer size, glazing spec and whether you're adding an ensuite all drive the number. You'll have an itemised written quote back inside 2-3 weeks.

A standard rear-dormer conversion typically runs 8-12 weeks on site. Mansards and larger L-shape wrap-arounds run 12-16 weeks. Design, planning and Party Wall usually add 6-10 weeks before that.

Rear dormer conversions on terraces often fall under permitted development, but PD rights are restricted in conservation areas, on flats and on some designated streets. Mansards almost always need full planning. We confirm at the feasibility stage.

Not when the steels are engineered correctly. We use an independent structural engineer to size steels against actual loads, and any decorative cracking during the build is snagged and made good before handover.

Every conversion carries our 12-month workmanship guarantee in writing. Manufacturer warranties on glazing and roofing membranes sit on top of that.

Yes, most of our loft conversions include a new bedroom and ensuite. Waste is either connected to the existing soil stack or pumped, depending on the layout.

Yes. Where steels bear into a shared wall, we serve Party Wall Notices as part of the job and coordinate with any appointed surveyor.

In North and West London, a well-executed loft conversion typically adds significantly more to the property value than it costs to build. Specific uplift is best confirmed with a local estate agent against comparable sold prices.

We work throughout North and West London, including St John's Wood, Paddington, Kensington, Bayswater, Regents Park, Hampstead, Hammersmith, Chiswick and Ealing Broadway.

London roofing preparation with battens and breathable membrane used as a refurbishment call-to-action background

Book your free survey

Ready to price your loft conversions
the honest way?

One site visit. One fixed-price written quote back the same week. No pressure, no hard sell, just the number and the plan to deliver it.

  • Free local survey
  • Written quote the same week
  • Fixed-price, staged payments
  • 12-month workmanship guarantee

Related services

Other work we deliver

View all services

Service

House Extensions

Learn more

Service

Full Renovations

Learn more

Service

Bathroom Installation

Learn more
Call JayRequest Estimate