One fixed price
The number in the quote is the number on the invoice. No day-rate creep.
Bathroom Installation · London
A finished bathroom you never think about again, plumbed, tiled, wired and sealed by one settled crew, on a fixed price agreed before we lift a tool. Typical bathroom refit: 2-3 weeks on site.
5.0★ on Google · Gas Safe registered · Written quote back in the same week.
15 yrs
On the tools
£1M
Public liability
5.0★
Google rated
12 mo
Workmanship guarantee
Same wk
Written quote
Service overview
A full bathroom installation covers everything from strip-out through first-fix plumbing and electrics, waterproofing, tiling, fixture installation, sealing, decoration and final testing. We handle the entire scope in-house so nothing gets lost between trades, the plumber, tiler, electrician and decorator you meet on day one are the same faces on handover day.
Homeowners refitting a tired family bathroom, landlords upgrading a rental to command a higher rent, and buyers renovating a newly-purchased London property before moving in. If you want one accountable point of contact instead of managing four separate trades, this is built for you.
Most owners call us when tiles are cracking, grout is failing, the suite dates the property, a leak has been ignored for too long, or a rear extension has changed the floor plan. If any of that sounds familiar, a fresh install almost always costs less than piecemeal repairs across the next 24 months.
A bathroom is the most punished room in the house, every joint, seal and substrate is under water pressure daily. Getting the hidden layers right (fall on the tray, tanking behind tiles, bonding on notifiable circuits) is what separates a bathroom that lasts 15 years from one that leaks into the kitchen ceiling inside two.
The cost of getting it wrong
The visible finish is only 20% of the job. The other 80% is what happens behind the tiles, and it's where under-priced installations quietly fail.
If ignored
Hidden leaks rot joists
A failed silicone bead or a badly bonded waste pipe can drip into the floor void for months before it shows on a downstairs ceiling. By then you're replacing joists, plaster and often the ceiling below.
Failed tanking = full re-tile
If a wet room floor isn't tanked properly, the only fix is to strip the tiles, tank correctly and re-lay. You end up paying for the same room twice.
Unsafe electrics fail insurance
Bathroom electrics are notifiable (Part P). Work signed off by a non-registered installer can void your home insurance and complicate a future sale.
Wrong falls, standing water
A shower tray or wet floor without a correct fall traps water, breeds mould in grout lines and damages surrounding cabinetry inside 12 months.
Common mistakes
Buying on day-rate, not fixed price
Day-rate jobs drift. Two extra weeks on site is normal, and the invoice at the end is the one you were trying to avoid.
Splitting trades to save money
Splitting plumber, tiler and electrician across three separate quotes almost always ends in blame-shifting when something doesn't line up. One accountable team costs less over the full job.
Skipping the survey
Quotes given over WhatsApp photos miss soil-stack runs, joist directions and boiler capacity, the three things that most often blow a budget mid-install.
How it works
01
Step 1
We visit, measure up, check soil-stack access, joist direction and boiler capacity, and listen to what you actually want the room to do.
02
Step 2
A detailed, itemised quote back inside the same week, scope, materials allowance, timeline and staged milestone payments.
03
Step 3
Old suite removed, waste and supply runs adjusted, notifiable electrics installed and tested, walls prepared for tanking.
04
Step 4
Waterproofing to Part G / BS 5385, tiling with correct falls, suite and brassware installed, decoration completed.
05
Step 5
Pressure tested, electrics certified, snag-free handover, and a 12-month workmanship guarantee in writing.
What you actually get
The number in the quote is the number on the invoice. No day-rate creep.
Correct tanking, falls and sealing, the hidden work that decides whether a bathroom lasts 3 years or 15.
NICEIC-registered partners issue the Part P certificate insurers and buyers ask for.
PRINCE2-managed schedule with weekly progress updates from the founder himself.
Settled team of 3-5 tradespeople, no faceless subbies rotating through your home.
Something's off after handover, we come back and put it right at no cost.
Materials & methods
Every London bathroom sits in a different property, a Georgian townhouse in Hampstead, a mansion-block flat in Bayswater and a new-build in Ealing all need different substrates, waste routing and boiler capacity. Here's the range we work in.
Family bathroom refit
Bath + separate shower or over-bath shower, storage vanity, dual-fuel towel rail. Typical 2-2.5 weeks on site.
Ensuite / guest cloakroom
Compact wet room or shower suite in tight footprints, often carved from a landing cupboard or corner of a bedroom.
Walk-in wet room
Fully tanked floor, tiled-in shower area, linear drain. Requires joist survey to confirm fall depth.
Luxury master ensuite
Freestanding tub, twin vanities, walk-in shower, underfloor heating, feature stone or large-format porcelain.
Loft / attic bathroom
Pumped waste (Saniflo / equivalent), macerator or new soil stack routing, low-height suite selection.
We install into Victorian and Edwardian terraces, mansion-block flats (with all the leaseholder consents that entails), 1930s semis, Georgian townhouses and modern new-builds. Commercial work, small hotel suites, boutique gym showers, restaurant staff facilities, is handled by the same team under our commercial fit-out service.
Every bathroom is quoted on a fixed-price basis after a free survey. A straight like-for-like family bathroom refit is a different job to a full wet room strip-out with joist adjustments, so we never quote from photos. You'll have an itemised written quote back inside the same week.
A standard family bathroom runs 2-3 weeks on site from strip-out to handover. Wet rooms and larger master ensuites are typically 3-4 weeks. The schedule is agreed with you in writing before we start and updated weekly.
Yes. Plumbing, tiling, carpentry and decoration are done by our own team. Notifiable electrics are installed and Part P certified through our NICEIC-registered partners, and any gas work is carried out by a Gas Safe registered engineer on our team.
Yes. Loft bathrooms usually need a pumped waste and a joist survey to confirm fall depth. Basements need a decent look at existing drainage and, in some cases, a sump pump. Both are quoted at the survey stage so there are no surprises later.
Every install carries our 12-month workmanship guarantee in writing. If anything falls short of the agreed scope inside that period we come back and put it right at no cost to you.
Yes, Gas Safe registered, £1,000,000 public and employer's liability insurance, Constructionline Gold and CHAS accredited. Electrical sign-off is provided via our NICEIC partners.
The hidden layers (tanking, falls, first-fix plumbing) should last the life of the property. Grout and silicone are consumables, expect to renew silicone around year 5 and re-grout as needed at year 10.
We work throughout North and West London, including St John's Wood, Paddington, Kensington, Bayswater, Regents Park, Hampstead, Hammersmith, Chiswick and Ealing Broadway. Local surveys are free.
For a like-for-like refit, usually not. For a new bathroom in a new location (loft, basement or extension) or notifiable electrics, yes, we arrange that sign-off as part of the job.
Book your free survey
One site visit. One fixed-price written quote back the same week. No pressure, no hard sell, just the number and the plan to deliver it.
Related services